29.08.2025

Welding work on the hull of the garbage collector catamaran, which has acquired the appearance of the designed vessel, is being completed.

The apparel has been welded and assembled, the garbage container is being welded, the console and lockers have been installed, and the external seams are being welded. The next stage of work: laying the electrical network, installing batteries, installing electric motors, glazing, interior finishing, and installing the fender.
Made on
Tilda